See our right-hand column for announcements and news briefs. Scroll down the right-hand column to access the Archives -- links to articles posted in the main column since 2007. See details about our site, including a way to comment, in the yellow text above the Archives.

Saturday, July 24, 2021

EGLE orders Enbridge to retrieve anchor in Mackinac Straits

LANSING -- The Michigan Department of Environment, Great Lakes, and Energy (EGLE) has instructed Enbridge Energy to remove an anchor that was left on the Straits of Mackinac lakebed. The agency continues to gather facts and information on the matter.

Enbridge informed the State of Michigan Wednesday night, July 21, that the 15,000-pound anchor was left by an Enbridge contractor after equipment failed when the contractor attempted to retrieve the anchor from the bottom of the Straits where it had been placed. Enbridge reports the anchor was several hundred feet from the twin Line 5 pipelines.

Enbridge has informed EGLE it is developing a retrieval plan and expects to have the anchor removed within days.

No comments: